Introduction of Gas Supply in New Belgrade – Which Blocks Will Be Able to Connect?
Bovan added that Srbijagas would be the carrier of the project and that, as soon as October, that company and the Municipality of New Belgrade would select the strategic partner that would carry out the works on establishing the gas supply system.
– It is only after the contractor is selected that the citizens will be able to get more detailed information about the price of the gas connection and the potential payment facilities – he said.
The city assembly of the municipality of New Belgrade, according to Bovan, has already adopted the plan of introducing gas supply, which entails the construction of 106 kilometers of a gas network, in the location in which there are no heating pipelines.
As said, the residents in the blocks 13, 18, 25 and 64, Usce, Tosin Bunar, the Highway Industrial Zone, Bezanija 2-Ledine, Bezanija and Bezanijska Kosa will be able to get a connection.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
26.04.2024. | Industry, Construction
Plans for continuation of construction of Belgrade sewer system announced – Section beneath river Sava to be 414 meters long, reconstruction of Karaburma tunnel
26.04.2024. | Industry, Construction
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
26.04.2024. | Construction
CLS: Where is the Ada Huja bridge project?
26.04.2024. | Construction