Section of Morava Corridor from Pojate to Makresane Opened – Investment in First Digital Highway Worth Around EUR 800 Million



This, as pointed out, is the first smart highway in our country, that is, the first digital highway. That means that the highway itself and its surroundings will be equipped with sensors and information about the situation on the road, potential crashes and other data, which ensures a high level of traffic safety.
The Morava Corridor is also the widest road in Serbia, with a width of 30 meters, and for its entire length, it will have a total of 11 interchanges, 71 bridges, 23 overpasses, 5 underpasses and 31 culverts. It will also have free internet stations.
According to the president of the municipality of Cicevac, Mirjana Krkic, this highway will mean a lot to both the resident and the economy of the municipality.
– The municipality of Cicevac is currently building the highway E75 and the fast railroad Stalac-Djunis, which is starting right at this moment. With this traffic route, the municipality will get a greater traffic of goods and people, and the municipalities of Cicevac and Varvarin are planning a joint construction of the industrial zone, which is also a big investment – Krkic pointed out in her statement for RTS.
As said, the industrial zone will spread on an area of 22 ha.
According to the president of Serbia, Aleksandar Vucic, the opening of the entire Morava Corridor is expected by the end of 2025.
– In September or October, we are opening the section of 11 kilometers to Kosevo, and by the end of 2024, the section Cacak-Adrani will be opened. Then we will open the remaining 56 kilometers by the end of 2025, whereby the widest digital highway in Serbia will be completed – Vucic pointed out.
As he said, on these 17 kilometers, 7 bridges, 3 overpasses, 6 culverts and 2 supporting walls have been done.
– People will feel the benefits both through new investments and the new industrial zone in Cicevac. This corridor will be used by all the people who go to the spa and Kopaonik – the president emphasized at the opening ceremony.
Also, as said, until the autumn, there will be no road toll on this section.
Take a look at our info map Construction of Highways and Fast Roads in Serbia and the Region.
Naš izbor
Most Important News
13.11.2023. | Transport
State Becomes Owner of 100% of Shares of Air Serbia

13.11.2023. | Finance, IT, Telecommunications
Customs Administration Starts Applying eCustoms System

13.11.2023. | Finance, IT, Telecommunications
13.11.2023. | Industry, Construction, Transport
Machines for Production of Batteries and Fuel Cells to Be Assembled in Stara Pazova – Muehlbauer Automation to Build Technology Park Worth EUR 29.5 Million

13.11.2023. | Industry, Construction, Transport
01.12.2023. | News
What Burdens the Serbian-Montenegrin Cooperation and Where Are the Opportunities?

01.12.2023. | News
12.11.2023. | Construction, Transport
Krusevac to Be Connected to Highway in Early December?

12.11.2023. | Construction, Transport
30.11.2023. | Construction, Transport
Provincial Government Issues Permit for Construction of First Section of “Vojvodina Smile” Fast Route

30.11.2023. | Construction, Transport