TPP Kostolac A to Get Facilities for Desulfuring and Waste Water Treatment – Looking for Consultant for Construction
According to the technical specification of the tender, the project pertains to the ecological reconstruction of both blocks of the thermal power plant.
The tender expires on January 31.
Let us remind that, previously, a desulfuring facility was built at the TPP Kostolac B, and the minister of environmental protection of Serbia, Irena Vujovic, said last summer that, at one block, the emission of sulfur-dioxide was reduced 115 times, and in another around 40 times.
Naš izbor
New EDS Tender – Opportunity to Strengthen and Develop Local Industry of Smart Meters Energy, Industry
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
26.04.2024. | Industry, Construction
Plans for continuation of construction of Belgrade sewer system announced – Section beneath river Sava to be 414 meters long, reconstruction of Karaburma tunnel
26.04.2024. | Industry, Construction
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
26.04.2024. | Construction
CLS: Where is the Ada Huja bridge project?
26.04.2024. | Construction