The second high furnace in Zelezara Smederevo put into operation - Job for 200 people more underway
Member of the Supervisory Board, Bojan Bojkovic said for RTS that this is an important Zelezara and a big day for Serbia. According to him, putting the furnace into operation brings 75 thousand tons of steel, sales of USD 300 m and jobs for 200 people.
Vucic said negotiations with a strategic, Chinese partner, Hebei iron and steel group (HBIS) have been in progress and that it is the second or even the most powerful steel plant in the world.
High furnace 1 started operating in 1971 and it was shut down for the first time in 1987 for an overall overhaul. More modern high furnace 2 then started operating with a maximal monthly capacity of 95.000 tons.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
26.04.2024. | Industry, Construction
Plans for continuation of construction of Belgrade sewer system announced – Section beneath river Sava to be 414 meters long, reconstruction of Karaburma tunnel
26.04.2024. | Industry, Construction
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
26.04.2024. | Construction
CLS: Where is the Ada Huja bridge project?
26.04.2024. | Construction