How the trains, procured by Serbia from China for the EXPO, could look like
- These trains are designed for a speed of 120 km per hour and will connect EXPO, Nikola Tesla airport and the national stadium with Zemun Polje. When the entire BG train network is reconstructed and upgraded, we will have 39 new compositions for seven BG train lines in full scale - wrote Vesic on his official Facebook account, along with sharing the appearance of the future train.
The trains should be delivered by the end of 2026 at the latest.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
31.05.2024. | Construction, Healthcare
Construction of GOC Narodni Front in Bezanijska Kosa to cost EUR 120 million – Here’s what it will look like
31.05.2024. | Construction, Healthcare
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
31.05.2024. | Construction
Ministry: 46 km of Morava Corridor in two sections to open to traffic by end-year
31.05.2024. | Construction