Gravel from West Morava to be Used in Construction of Embankment on Preljina-Pozega Highway
– In the period while the dam in Parmenac is up, the plan is for the works on the regulation of the river bed through the removal of gravel layers upstream from the dam to be done and for the material to be used for the works on the highway. At the same time, the low water level will be used for the works on the inlet structure of the hydromelioration system Parmenac-Ljubic as part of the works on the revitalization of the entire irrigation system. After the dam sluices are lowered in June, the development of the river dam downstream from the dam will continue – Todorovic said on Facebook.
This way, according to him, the opening of at least one material source site in Prijevor will be kept, on an area of over one hectare, and at the same time, the bed of the West Morava will be developed, which, as he pointed out, is important for multiple reasons, for the formation of the accumulation for an alternative water supply of the city during the summer and for the reduction of flood risk.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
26.04.2024. | Construction
CLS: Where is the Ada Huja bridge project?
26.04.2024. | Construction
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
25.04.2024. | Construction, Transport
Railroad from Novi Sad to Subotica connected – Regular traffic at year’s end
25.04.2024. | Construction, Transport