Tram Line Along Pancevo Bridge to Prokop Instead of First Subway Line, BG Voz to Obrenovac
The area covered by the GRP of the railway systems is around 2,356.16 ha.
Plan for the subway
This document envisages three subway lines.
– Subway line 1 on the Makis-Mirijevo route, around 21.1 kilometers long, with 21 stations.
– Subway line 2 on the Depo Bezanija-Mirijevo, around 19.2 kilometers long and 22 stations and a part of the route of around 0.8 km toward the subway station Z.S. Zemun.
– Subway line 3 on the Banjica-Block 61-Bezanija route, around 22.7 kilometers long, with 23 stations.
Tram network
The development of the tram network is planned in the Srem, Sumadija and Banat sections of Belgrade. In said areas, the plan is to realize 42.26 kilometers of new tram network section (with a structure along the Pancevo Bridge).
In the Srem section of the city, the plan is to develop 16.18 kilometers of a two-track tram railway, with 17.91 km in the Sumadija section and 10 km in the Banat section.
BG Voz
The master plan of the development of the transportation infrastructure – SMART PLAN from 2017 envisages the further development of the BG Voz system, and the proposed planning solutions are included in this plan.
- Subway Must go to KCS and Prokop, Residents Along Ibar Main Road Not Aware of Being Left out of the Plan – What Initiative of “Po Meri Metro” Association Envisages for Line 1
- Instead of Subway Route to Clinical Center of Serbia, City Authorities Announcing Escalator to Nearest Station
- BG Subway Second Line Route Extended to New Bezanija Cemetery – Tender for Preparation of Digital Topographic Plan Opens
The implementation and realization of line 4 of BG Voz is planned as well, on the route from the New Belgrade railway station to the Nikola Tesla Airport and further to Surcin – Surcinska Street, the National Stadium and then through the territory of the municipality of Surcin toward Obrenovac.
The further expansion of the railway network and the implementation of new BG Voz lines will enable the connection of the municipality of Obrenovac to the system of the city and suburban railway. The connection of Obrenovac to this system can be realized through an extension of the planned line 4 from the direction of the National Stadium.
In addition to said things, there’s also a plan to build the capacities of the Beograd Centar railway station, to reconstruct the capacities at the Beograd Ranzirna station for the purposes of the forming of a container terminal, to build RTC Beograd in Makis, to build TPS Zemun and Kijevo and to build the New Belgrade railway station.
I. Milovanovic
Naš izbor
Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
27.03.2024. | Industry, Transport, Finance
City to Waive Over 30 Zemun and Palilula Bus Lines to Private Transporters – Draft Public-Private Partnership for 10-Year Period Ready, Job Worth Half a Billion Euros
27.03.2024. | Industry, Transport, Finance