Bridge on the Sava near Obrenovac opens for traffic
The bridge on the Sava near Obrenovac was today opened for traffic. A total of RSD 1.5 billion were invested in the construction of this bridge by the City of Belgrade and the Ministry of Environment, Mining and Spatial Planning.
The steel part of the bridge across the river is 442 meters long, the lenght of an access ramp on the Surcin side of the bridge is 180 meters, so that the entire structure of the bridge is 622 meters long.
That is the only bridge between Sabac and Ostruznica. It is 14.5 meters wide and has two traffic lanes, pavements on both sides and two belts for installations and infrastructure.
The bridge on the Sava, which connects Obrenovac and Surcin, is part of so-called Srem Gazela route that will run from the bridge to the Dobanovci cloverleaf interchange on the highway.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
22.04.2024. | Transport
City of Belgrade selling garages – Initial price EUR 7,000
22.04.2024. | Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
22.04.2024. | News
German retail chain Mix Markt to open first stores in Serbia in three locations on April 29
22.04.2024. | News