Construction of towers next to unfinished garage near Genex possible – “Mixed city centers” zone planned on 135,280 m2
The preparation of the plan was commissioned by the company Verano, which bought the unfinished seven-story garage from the state company Napred in 2005.
The area covered by the plan encompasses the part of the block between Narodnih heroja and Studentska streets and Arsenija Carnojevica Blvd. The area has about 2.71 ha and features undeveloped surfaces, within which are the abandoned garage facility and wild shrubbery.
According to the document, through the planning development, the possibility of forming direct access to the location from the existing traffic routes in the area will be examined.
The GLA for the mixed city centers is planned to be 135,280 m2 and the plan is to have around 3,000 tenants there. The maximum height of the building cornice, according to the document, is 32 m, and “the possibility of the construction of tall facilities will be re-examined.”
The Study was prepared by Urbanisticki centar, and the early public inspection will last until September 30.
Back in 2009, a multi-functional complex with the highest rotating tower in Serbia, “Verano Tower”, was planned in this location. According to the project of the company Projmetal, the complex was supposed to feature business and commercial parts, as well as a hotel.
I. Z.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
11.10.2024. | Finance
BIG buys Promenada Novi Sad for EUR 177 million – NEPI Rockcastle withdrawing from Serbian market
11.10.2024. | Finance
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
11.10.2024. | Industry, Construction
French company to build Belgrade waste water treatment facility – Final preparations for signing agreement with Suez
11.10.2024. | Industry, Construction