To Zagreb at 200 km per hour – Spatial Plan of second fast railroad through Srem available for public inspection again
The Spatial Plan which is available for public inspection again aims to modernize the existing railroad which connects Serbia and Croatia (EU) and is part of the main railroad Belgrade-Zagreb and is part of the Pan-European Corridor H, branch “C” and part of the rail cargo corridor The Alps-Western Balkans.
The basic idea behind the modernization and reconstruction of the railroad Belgrade-Sid-Croatia state border Stara Pazova section-Ruma-Sid-Croatia state border entails the forming of a two-track main railroad for mixed (passenger and cargo) traffic on both sides for a planned train speed of up to 200 km/h, whereas the railroad section Indjija-Golubinci is designed as a two-track section (by adding a new track) for a planned train speed of up to 120 km/h as the most rational solution.
The route of the railroad Stara Pazova-Sid-state border, which is the subject of the plan, is 84.2 km long, whereas the length of the Indjija-Golubinci railroad is 4.2 km. Both lengths are given according to the survey marks of the right-hand track. It needs to be noted that the final 1.5 km of the track of the Indjija-Golubinci railroad are located within the station.
Because of the rationalization of the costs of construction and the level of the service, and due to the spatial or other limitations, it was not possible to achieve the speed of 200 km/h on the entire section. In the zone of the Ruma and Sid stations, a speed of 160 km/h has been adopted, whereas, in the zone of the Sremska Mitrovica station, a speed of 120 km/h has been adopted. On the parts of the route Stara Pazova-Golubinci and Indjija-Golubinci, speeds of 160 km/h and 120 km/h have been adopted.
The public inspection lasts until August 26.
A. K.
Naš izbor
Surlan: Construction of Fast Railroad Belgrade-Nis by 2029, Preparation of Project Documentation in Progress Construction, Transport
Expansion of Port of Sremska Mitrovica Begins – Expropriation to Follow, Plan Includes Connection with Railroad Construction, Transport
Reconstruction of 400 km of railways in Vojvodina - 435 km have been permanently abandoned Industry, Construction, Transport
Railroad to Croatia to Be Designed for 200 km per Hour Too – Overpasses for Both Vehicles and Wild Animals Construction, Transport
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
12.09.2024. | News
RIVA Shopping Center opens in Velika Plana on 11,280 m2
12.09.2024. | News
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
12.09.2024. | Energy
First local factory which produces pellets from solar energy
12.09.2024. | Energy