Djedovic: Functional tests of block B3 of TPP Kostolac to begin before August
In the press release, the ministry says that Djedovic Handanovic said in Kostolac during her conversation with the president of CMEC, Fang Yanshui, and the visit to the block built by that company, that all the physical works on that structure of strategic importance for Serbia had been completed.
The minister said that there had been certain delays, that it was a big and complex project, built under difficult circumstances, but that it would be absolutely the safest and most modern one that Elektroprivreda Srbije had, as it had been built in line with the most modern standards, including the most modern environmental protection standards.
She also estimated that the new block was of fundamental importance for the energy security and safety of Serbia, especially considering the increased need for electrical energy in the winter, but also the summer.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
13.09.2024. | Tourism, Sports, Culture, Healthcare
Construction of camping and glamping accommodation capacities near spas in Serbia planned
13.09.2024. | Tourism, Sports, Culture, Healthcare
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
12.09.2024. | News
RIVA Shopping Center opens in Velika Plana on 11,280 m2
12.09.2024. | News