Documentation for Agreement on construction and delivery of vehicles for first phase of line 1 of Belgrade subway with French Alstom being prepared
As announced by the PUC Belgrade Metro and Train, during the first cycle of the workshops, the technical details regarding the future functioning of the system were harmonized.
The workshop was also attended by the planning team hired for the preparation of the preliminary design of the Belgrade Subway project, the French company Egis and representatives of the consortium of two European companies, the German Deutsche Bahn and the French Systra, as well as the project managers of the first line and the depot for the Belgrade subway.
Alstom offers a wide range of equipment and services, from the construction of fast trains, metros, trams and e-buses, to integrated systems, infrastructure, signalization and digital mobility solutions.
The PUC Belgrade Metro and Train and the Secretariat for Public Transport of Belgrade already signed the Agreement on the provision of services with Alstom at the beginning of March this year, through which the documentation regarding the subway system as a whole will be prepared, which is primarily important for the construction of the depot, and then also for the construction of the entire line 1 of the subway.
This document is also a preparation for the main contract through which Alstom will carry out the designing, construction and commissioning of the transport system of the Belgrade subway.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
12.09.2024. | News
RIVA Shopping Center opens in Velika Plana on 11,280 m2
12.09.2024. | News
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
12.09.2024. | Energy
First local factory which produces pellets from solar energy
12.09.2024. | Energy