Center for Local Self-Government: Low Level of Investments in Belgrade, Numbers Worrying
– The Secretariat for Investments has realized only 28.9% of the planned projects, that is, 4.4 billion remains unused, which means drastically fewer reconstructions of streets, sewer and water systems, fewer reconstructed schools, kindergartens and health centers – Jovanovic said.
He added that the low level of investments was Belgrade’s systemic problem.
– Due to which the existing infrastructure is going to ruin, and the new one does not follow the tempo of the development of apartment building, which is why the quality of life in the capital of Serbia is falling down drastically, and that is the exclusive responsibility of the city administration and the mayor – Jovanovic concluded.
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
07.09.2024. | Industry, Transport
Temporary border crossing opened at MIND Kragujevac Airport
07.09.2024. | Industry, Transport
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
06.09.2024. | Transport, Finance
Green card for entrance to these three countries to be removed
06.09.2024. | Transport, Finance