Biggest Wind Farm in Serbia to Be Built in Territories of Srbobran and Becej – Vetrogon to Have Facility for Storage of Electricity and Its Turning into Other Forms of Energy
The Vetrogon wind farm will be located in the territories of the municipalities of Srbobran and Becej. More precisely, it will encompass the entire cadastral municipalities of Srbobran, Becej and Radicevic, on an area of around 457 m2.
The investor is CWP Global.
The construction of 55-75 wind generator poles, with an individual installed power of no less than 5 MW, is planned, and the total power will be around 450 MW, which will make Vetrogon the biggest wind farm in Serbia.
The biggest areas within the plan are currently taken up by crop farming land, and the zone for the construction of wind generators will encompasses space outside the construction area of the settlement.
The produced electrical energy will be transferred to the power transfer system through a 35 (33) (20) kV cable network, within the planned transformation station 35 (33) (20) / 400 (220) kV.
The construction of a facility for the delay of the use of the electrical energy relative to the moment when the electrical energy is produced, that is, a facility for the transformation of electrical energy into other forms of energy and the storing of such energy for the purpose of a subsequent transformation back into electrical energy, is planned as well.
The drafting authority is the PE Zavod za urbanizam Vojvodine (Urban Planning Institute of Vojvodina).
As the investor announced earlier, this investment will be worth EUR 600 million, and its construction should start at the end of 2025. When it is put into operation at the beginning of 2028, the Vetrogon wind farm will produce 1.1 terawatt-hours a year.
B. P.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
13.09.2024. | Construction, Finance
Government of Serbia and City of Belgrade to form joint working body for more efficient project implementation
13.09.2024. | Construction, Finance
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
13.09.2024. | Industry
Canadian company discovers more high-quality gold in Serbia – Mine to open as soon as 2028?
13.09.2024. | Industry