FV Plant 1 from Belgrade Planning Construction of Solar Power Plant of 5.5 MW in Adasevci

Source: eKapija Wednesday, 26.04.2023. 12:00
Comments
Podeli
Illustration (Photo: Pixabay.com/Zsuzsa Bóka)Illustration
The investor FV Plant 1 from Belgrade is planning the construction of a solar power plant in Adasevci in Sid with a planned approved power of 5.5 MW. According to the Detailed Regulation Plan, which was available for public inspection on the official website of the municipality of Sid, and which was prepared by the MI-MI Inzenjering engineering design studio from Belgrade, the plan encompasses one whole parcel and part of another parcel, and the area covered by the plan is 92,400 m2.

The area covered by the Decision on the preparation of the Plan is located east of the settlement of Adasevci and consists of agricultural land.


The area covered by the plan is entirely meant for the construction of features in the function of a solar power plant, and the solar power plant is planned to spread on an area of 6.39 ha.

The mounting of a total of 46 inverters is planned, and the final number of panels depends on the power of the installed panels, whose total power may not exceed 5,500 kW (5 MW).

Lokacija:
Google Maps
Comments
Your comment
Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.