DIP doo Novi Sad Planning Extension, Reconstruction and Repurposing of Existing Facilities into Aluminum and Non-Ferrous Metals Foundry
The location which is the subject of this Urban Project consists of the cadaster parcel no. 11 KO Novi Sad III in Novi Sad. The area covered by the urban project is 6,351 m2. The location features an industrial complex for the production and sale of non-ferrous metal castings.
The physical structure in the location consists of a total of 10 facilities, nine of them in the current state and one which has been reconstructed and extended (of the existing four) and repurposed into a foundry of aluminum and non-ferrous metals.
A. K.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
17.04.2024. | Industry, Construction, Transport, Finance
Feka Automotive to build energy-efficient production facility – EBRD approves EUR 15 million
17.04.2024. | Industry, Construction, Transport, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
16.04.2024. | News
Polish chain Zabka to come to Serbia?
16.04.2024. | News