– The concept, which initially entailed a hotel and several apartments, grew into Kosmiko Hill, a luxury resort – condominium, which is a combination of urban luxury and nature, with villas, vineyards, a winery, restaurants, a spa center… – Stanojevic, who has lived in Napa himself, said for eKapija.
3. Novi Sad Waterfront“An Analysis of Traffic with the Help of Micro and Macro Simulations of Traffic Flows in the Shipyard Location in Novi Sad”, which was prepared by
Via Inzenjering doo in 2019, shows that
around ten buildings might be built in this area.
The space is divided into five zones, one of which is exclusively a business zone, whereas another is exclusively residential. Other zones are mixed and intended for both residential and commercial features. A hotel is planned in one zone as well, so “a balanced ratio of traffic directions” is planned, due to the arrival of guests to the hotel.
According to estimates, there could be 2,299 apartments in these zones, in residential and mixed buildings. The total floor area of the planned facilities is 39,600 m2.
4. EXPO 2027Next to the future National Stadium in Surcin, the multifunctional complex
EXPO 2027 is to be built. This is said in the Draft Spatial Plan of the Special-Purpose Area of the National Football Stadium.
In June last year, the Government of Serbia adopted the decision by which the Project of the construction of facilities to the end of the realization of the international specialized show EXPO BELGRADE 2027, with the accompanying features, was pronounced a project of significance for the Republic of Serbia.
On 830,000 m2 of exhibition space, a multifunctional space for exhibitions and congresses of the highest state importance is planned. The construction of a hotel and an apartment hotel on 69,336 m2 is planned within the unit meant for accommodation capacities, whereas commercial features will spread on 229,105 m2.
5. Tempo Tower skyscrapers in Bezanijska KosaIn Bezanijska Kosa, in Partizanske Avijacije Street, three
Tempo Tower skyscrapers will be built, and the project will be financed by the private investors who own the land.
The investors announced that “three new traffic routes will be built as well, and additionally, across the highway, a pedestrian-cycling bridge is planned to be built, connecting the Sports and Recreation Center “11. april” with the other sports features in Bezanijska Kosa”.
The announcement of the construction was not welcomed by the residents of the Bezanijska Kosa settlement, who gathered at the outdoor sports courts of the Sports Center “11. april” in order to express their dissatisfaction due to the attempts of the investor to change the Detailed Regulation Plan and build three skyscrapers of 100 and 120 meters.
6. Tower at the corner of Tresnjinog Cveta Street and Mihajla Pupina Blvd BelgradeThe Secretariat for Urban Planning and Construction of the City Administration of Belgrade announced, at the beginning of 2022, an early public review on the occasion of the preparation of the Detailed Regulation Plan for a part of the New Belgrade Block 11a, according to which,
the construction of a tower of up to 80 meters is planned at the intersection of Tresnjinog Cveta Street and Mihajla Pupina Blvd.
The DRP for said part of Block 11a was prepared at the initiative of a legal entity, the company
Kantata from Belgrade, the owner of the parcels within the borders of the proposed plan. The total area covered by the plan is around 4 ha.
As can been seen from the orientation display of the planned capacities, the construction of 14,000 m2 of open-space office space is planned.
7. K4 Kosmaj complexIn a location a fifteen minutes’ walk away from the very peak of Kosmaj, the plan is to build the K4 settlement, four houses in a row featuring a mountain building style with slanted roofs. The works completions deadline is 2024. The designer and the investor in the construction is Atelje Djukic from
Mladenovac.
– The is a specific, “loose” row of connected houses, so each house of 102 m2 will have its own access and privacy ensured through separation walls with lined flower pots, as well as front and back yards and a pool. Considering that this is a descending terrain, the pools are elevated, narrow and long and thereby suitable for swimming – Djurdja Djukic, the author of the project and one of the owners of Atelje Djukic, said for eKapija and emphasized that, in terms of its architectural features, that style of construction had not been seen before on Kosmaj.
8. AFI City ZmajAt the end of last year,
AFI Europe Serbia announced that it was launching a new project –
AFI City Zmaj. This business complex, which is being raised in the location of the famous Zmaj factory, is to consist of an east and a west wing: AFI CITY ZMAJ East and AFI CITY ZMAJ West.