Ski Center Kopaonik to Get Another Gondola – Combined Ski Lift Mali Karaman to Have 48 Seats and 15 Gondolas on 1,310-m Route
According to the project, which was prepared by Bauprojekt from Belgrade, and whose investor is the PE Ski Resorts of Serbia, the planned gondola will be built on an area of 29.69 ha, in the territory of the cadaster municipalities Kopaonik and Brzece.
The planned location of the combined gondola-ski lift Mali Karaman is on the route of the existing ski lift Mali Karaman on the Mali Karaman-Suvo Rudiste route (Mali Karaman-Military Home) and the new facility is to replace the existing ski lift along the same route.
The combined ski lift with a maximum speed of 5 meters per second will have the form of a mixed separable lift for 6 passengers on the seats and 10 passengers on the gondola, and it will have a total of 63 vehicles – 48 seats and 15 gondolas.
The maximum planned length of the ski lift route is 1,310 meters.
B. P.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport