Predejane stays on changed route of Corridor 10 through Grdelica Gorge
Chairman of the Assembly of Leskovac Zivojin Stefanovic stated yesterday that the competent ministries and CIP Institute had accepted a proposal of the local self-government for a change in the preliminary solution for the new route of Corridor 10 through Grdelica Gorge that would not go around the small town of Predejane.
Stefanovic said at a press conference that the solution proposed by the city planners of Leskovac was 10 to 15 thousand euros cheaper because it did not envisage the construction of a tunnel 1.7 km long.
- We are already working on the new project and we expect the investor - Putevi Srbije, to approve it by the end of January 2011 - said Stefanovic.
According to the preliminary project prepared by CIP, Corridor 10 was supposed to go around Predejane and the namesake motel, which is the only company on that territory and employs 140 people.
- If that international highway went around Predejane, that area would be deserted in ten years because the cloverleaf interchanges would be built about 10 km from that small town - said Stefanovic.
The Chairman of the City Assembly said that "the tunnel lobby" had insisted on the construction of the highway trough a tunnel.
- There is no need for a tunnel because there is a simpler solution. I wonder who in Belgrade has an interest in insisting on taking from this poor state 10 or 15 thousand euros more and forcing the people in Predejane to move out of their homes. I assume it is a tunnel lobby - Stefanovic concluded.Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
28.03.2024. | Construction, Healthcare
Price for Construction of Tirsova 2 to Increase After All? – State Negotiating with Potential Contractors About Estimated Value of Works
28.03.2024. | Construction, Healthcare