CIP Institute of Transportation to Prepare Technical Documentation for Construction of Pedestrian-Cycling Bridge on the Danube in Novi Sad
As the mayor of Novi Sad, Milos Vucevic, announced on his Instagram profile, the signed agreement is worth RSD 51.8 million, and the deadline period for the completion of all the obligations under the contract is 180 days.
Along with the bridge, which is to be raised on the columns of the former Franz Joseph Bridge, the plan also includes access road areas and the reconstruction of the existing tunnel with elevators to the upper plaza of the Petrovaradin Fortress.
– I have great news for all lovers of ecology, cycling and nature, which is that Novi Sad is soon getting its fifth bridge, the pedestrian-cycling bridge on the Danube. The new bridge will reduce pollution in the city and additionally motivate my fellow citizens to exercise – Vucevic said.
Let us remind that the tender was published in December 2021, and the first prize for the preliminary design was awarded back in late 2019.
A. K.
View this post on Instagram
A post shared by Милош Вучевић (@milosvucevic_gradonacelnik)
Naš izbor
Apartments away, villa for the day! - Celebrations in luxury houses with swimming pools are becoming a profitable business in Serbia Tourism, Sports, Culture
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
16.09.2024. | Construction, Transport, Tourism, Sports, Culture
Which projects is Belgrade looking at? – Construction of “new Serbian bridge”, designing of zoo, monument to Draza Mihailovic…
16.09.2024. | Construction, Transport, Tourism, Sports, Culture
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
16.09.2024. | Construction, Transport
Construction of towers next to unfinished garage near Genex possible – “Mixed city centers” zone planned on 135,280 m2
16.09.2024. | Construction, Transport