Subotica to Get New Solar Power Plant Bikovo on Nearly 80 ha – Novi Sad-Based Company Plans Construction on Land of Former Azotara
The detailed regulation plan, which the City of Subotica has put up for an early public review, covers slightly less than 80 hectares of land, and this is undeveloped land.
The construction of a complex of a solar facility is planned on this location, that is, a facility for the production of electrical energy from solar energy and the inclusion of the produced energy into the transfer system. According to the plan, a facility of the maximum possible installed power is envisaged, of over 50 MW, and its connection to the transfer network.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport