Dr Laza Lazarevic Clinic to be Reconstructed and Extended
The existing complex consists of an inpatient department (3,890 m2), a dispensary (680 m2), an outpatient hospital (535 m2) and “The Doctor’s Tower” (1,000 m2). The intention is for the dispensary and the outpatient hospital to be integrated into a single facility, with a basement and three floors (including the ground floor).
Each functional unit is designed to occupy one floor. In addition to that, a basement space is formed as a crawl space and a unified archive for the entire psychiatric clinic. It is connected with the ground floor by a staircase and an external entrance on the east side. The topmost floor features the administrative space for the entire clinic.
The project envisages the reconstruction of the inpatient department and the construction of a new dispensary and outpatient hospital. The new facility will have a total area of 1,300 m2.
The outpatient hospital is meant for 90 users and the plan is for it to feature, among other things, rooms for individual, group and work therapy, a library and doctors’ rooms.
“The Doctor’s Tower” – a museum of psychiatry – is meant to be reconstructed. The plan is for it to feature a permanent exhibition on the history of psychiatry, a room for seminars, a café, the management rooms and the offices of the scientific research and education services.
– “The Doctor’s Tower” building is protected as a cultural monument of great importance and will be reconstructed in full cooperation with the Institute for the Protection of Cultural Monuments of the City of Belgrade – says the urban project.
The project was prepared by Forma Antika doo from Nis.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
17.04.2024. | Industry, Construction, Transport, Finance
Feka Automotive to build energy-efficient production facility – EBRD approves EUR 15 million
17.04.2024. | Industry, Construction, Transport, Finance