Tender for Preparation of Project-Technical Documentation of New Block of 350 MW at TPP Kostolac
Elektroprivreda Srbije has just opened the tender for the preparation of the project-technical documentation for this project, which envisages the realization of the project in 14 phases.
The project includes the designing of the block itself, as well as the functional parts which pertain to the disposal and storage of ash, traffic routes and a cooling system using the water from the Danube.
The block will be highly-efficient, and the network output is expected to be 308 MW.
The tender is open until November 22.
N. I.
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
07.09.2024. | Industry, Transport
Temporary border crossing opened at MIND Kragujevac Airport
07.09.2024. | Industry, Transport
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
06.09.2024. | Transport, Finance
Green card for entrance to these three countries to be removed
06.09.2024. | Transport, Finance