Cooperation of Belgrade and Pristina on Construction of Battery Storage Power Stations
![](https://www.ekapija.com/thumbs169/prerada_litijuma_090323_tw1024.jpg)
The two chambers are planning to establish a joint energy sector group, which would provide support to the construction of battery storage power stations and be a part of a joint team, which would facilitate investment projects in line with the agreement on the normalization of economic relations with the mediation of the USA.
The group will also support lithium research projects, following the achievements of the mining company Rio Tinto, which discovered a lithium borate site in the Jadar river valley in Serbia fifteen years ago, which is estimated to contain 10% of the global reserves of this metal.
In the sector of power distribution, the systems of power storage for later use contribute to long-term reliability and elasticity. The key technologies of the power storage systems are pump hydro power plants, compressed air energy accumulators, flywheels, batteries and condensers.
Since recently, lithium-ion batteries have taken advantage as the leading battery technology thanks to their greater efficiency. The key instigator of growth in the construction of energy storage systems is the collocation of power plants for the production of renewable energy with power plants for the storage of energy. That this is a very current trend is shown by the fact that, in Maribor, Slovenia, the construction of one such power plant, of 25 MWh, which will provide 5 MW to the system in 5 hours, has just started.
![Privredna komora Srbije](/logo/14464_logo.gif)
![Privredna komora Kosova i Metohije Kosovska Mitrovica](/logo/60003_logo.gif)
![Rio Sava Exploration d.o.o. Beograd](/logo/75157_logo.gif)
![Rio Tinto plc London](/logo/8001403_logo.gif)
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
![](https://www.ekapija.com/thumbs169/ng_belgrade_conf_2024_1_070524_tw630.jpg)
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
![](https://www.ekapija.com/thumbs169/operacija_070815_tw630.jpg)
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
![](https://www.ekapija.com/thumbs169/specijalna_bolnica_gejzer_sijarinska_banja_090323_tw630.jpg)
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
26.07.2024. | Industry, Construction
Biggest gold site in Europe up for sale – Initial price for Lece mine near Medvedja EUR 34.5 million
![](https://www.ekapija.com/thumbs169/rudnik_vagon_300517_tw630.jpg)
26.07.2024. | Industry, Construction
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
![](https://www.ekapija.com/thumbs169/palfinger_fabrika_nis_170523_tw630.jpg)
07.05.2024. | Industry, Construction
26.07.2024. | Industry, Transport
Moving of departures to new BAS to start in mid-September – Buses from south direction to enter through Ring Road, city line transfers to be made near Transped
![](https://www.ekapija.com/thumbs169/autobuska_stanica_novi_beograd_030324_tw630.jpg)
26.07.2024. | Industry, Transport