Serbia completes its section of TurkStream
Gas will be delivered from TurkStream through Bulgaria, Serbia and further to Hungary, through this pipeline, and further works on the gas infrastructure are being prepared.
The director of Srbijagas, Dusan Bajatovic, told RTS that 403 kilometers of pipes within the TurkStream gas pipeline had been laid down in Serbia.
– The whole route has been bored through, beneath the Danube, the Tisa, the Morava, all the canals... the pipes have been connected. We expect to complete the works on the measuring station – Bajatovic said.
As he added, Serbia will have three exits from the pipeline – near Paracin, Belgrade and Zrenjanin, and the connection to the Banatski Dvor gas storage remains to be built.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
23.04.2024. | Construction, Transport
Tender for first section of Belgrade-Nis fast railroad from Velika Plana to Paracin announced
23.04.2024. | Construction, Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
22.04.2024. | Industry, Transport
Serbia to develop project of “flying taxis” for EXPO with Airbus – Signing of memorandum announced
22.04.2024. | Industry, Transport