RATEL planning construction of new Control and Measurement Center in Dobanovci with 260 employees
As could be seen, the plan is to build facilities for the needs of the new Control and Measurement Center Belgrade within the complex, which should feature technical, administrative and operating structures, as well as side structures. A 4-floor building is planned, and the antenna masts will be up to 50 meters tall. The exact height will be specified during the preparation of the Draft Plan, in cooperation with the competent institutions.
The documentation says that parking spaces for official vehicles also need to be provided.
Natural gas will be used for heating.
The plan covers a 15-ha area, and the entire complex should have 260 employees.
The preparation of the plan was commissioned by RATEL, and the town planning consultant was the Secretariat for Urban Planning and Construction. The drafting authority was the Urban Planning Institute of Belgrade.
A. K.
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
13.09.2024. | Tourism, Sports, Culture, Healthcare
Construction of camping and glamping accommodation capacities near spas in Serbia planned
13.09.2024. | Tourism, Sports, Culture, Healthcare
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
12.09.2024. | News
RIVA Shopping Center opens in Velika Plana on 11,280 m2
12.09.2024. | News