Source: Blic | Thursday, 15.08.2019.| 14:02
Highlight an article Print out the news

Road toll on Obrenovac – Cacak motorway RSD 420

Illustration (Photo: Milos Muller/shutterstock.com)
The section of the Milos The Great highway between Obrenovac and Cacak , which will be opened on August 18, will have two front and four side toll booths whereas the road toll for passenger vehicles should be around RSD 420.

Front toll booths will be placed in Obrenovac and Preljina and will have seven toll collection lanes while the side toll booths will be stationed in Ub, Lajkovac and Takovo.

Three sections that will be officially opened for traffic on Sunday have total length of 103km and can be traveled in 45 minutes if you drive 130 km per hour which is the speed limit on the most of the road.
Only logged-in users can comment.