Serbia to get grant of EUR 40 million for highway to Pristina
The total value of the construction of the 33-km Nis-Plocnik section is EUR 212 million, and, in addition to the WBIF grant, the project will use the proceeds from the loans of the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD).
In addition to the grant for the Nis-Plocnik highway, another EUR 3.8 million has been set aside within the WBIF for the preparation of the technical documentation for projects in water and rail transport, including the reconstruction of the Belgrade-Zagreb railway in Serbia’s territory.
A total of EUR 3 million is meant for the preparation of the feasibility study, the preliminary project and the strategic environmental impact assessment for the Stara Pazova-Golubinci-Sid and Indjija-Golubinci sections of the Belgrade-Sid-state border railway.
Furthermore, EUR 800,000 will be invested in the preparation of the feasibility study and the preliminary design for the construction of the Belgrade port on the European corridor Rhine-Danube.
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
03.10.2024. | Transport
Former president of Serbia becomes director in Chinese space company
03.10.2024. | Transport
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
02.10.2024. | Construction, Transport
Looking for designer of highway through South Banat again, price tripled – 65 km in four lanes from Pancevo to Romanian border
02.10.2024. | Construction, Transport