Highway section of 6.6 km on Corridor 10 opens for traffic
The section also includes the Bujanovac 1 interchange, which enables a direct entrance and exit from Bujanovac next to Bujanovacka Banja and access to the entire existing network of state roads and local roads in this highway zone.
After the exit from the highway at the interchange and down the parallel alternative road to Vranje, long 2.5 kilometers, in Davidovci, there is a turning towards the Prohor Pcinjski Monastery. The permanent signalization has been installed.
As a part of the section and the Bujanovac 1 interchange opened for traffic while the remaining works were being executed, the PE Roads of Serbia warns all drivers to comply with the installed signalization and be especially careful in the zone where the works are still being carried out, the press release says.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport