Duboka water plant opens in Neresnica near Kucevo – Investment worth RSD 120 million
In the past year, Andjelkovic Al took all the necessary measures for raising the level of efficiency and effectiveness of the Duboka water plant and carried out preparations for successful and safe operations. Andjelkovic Al invested around RSD 120 million in securing top quality equipment and the latest water-filling technology.
Thanks to this investment, three water bottling lines of renowned Italian producers, Procomac, S.I.P.A. and Ferrari, were completed, featuring modern bottling technology.
The capacity of the plant is 8,000 to 15,000 bottles an hour, depending on bottle size. The Duboka mineral water is available in the market in PET packaging of 0.25, 0.33, 0.5, 1.5 and 2 liters, large packages of 6.6 liters and the glass packaging of 0.375 and 0.8 liters. Duboka has a pleasant, specific flavor and may be consumed in unlimited amounts.
The springs are located on the Homolje mountains, in Neresnica, in an ecological environment at the depth of 282 m, and some of them are over 20,000 years old. Thanks to Duboka's top natural physical-chemical and microbiological quality, it is not processed. The plant only carries out preventive processes of UV sterilization and microfiltering.
Duboka is one of the best mineral waters in Serbia. In addition to it natural characteristics, its quality is also down to top food safety standards at the plant – ISO 9001, ISO 22000, ISO 14001 and ISO 18001.
The results of the testing carried out by the Institute for Rehabilitation of Belgrade back in November 1991 showed that his natural mineral water belonged to the category of calcium-hydrocarbonate mineral waters. It doesn't contain high concentrations of elements such as sodium and it features a considerable presence of microelements such as essential elements which raise the water's quality.
This makes its mineral composition unique in the Serbian market. It contributes to good health and improved body functions.
According to Zoran Andjelkovic, the price is affordable to all consumer categories. The business plan includes the marketing of the water in the local and the foreign markets in the upcoming period. Agreements have already been signed with some foreign companies, and negotiations with new purchasers are in progress. The factory currently has 10 workers and its is expected that at least 20 people will be employed next year.
Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
28.03.2024. | Construction, Healthcare
Price for Construction of Tirsova 2 to Increase After All? – State Negotiating with Potential Contractors About Estimated Value of Works
28.03.2024. | Construction, Healthcare