Beschreibung der Tätigkeit
–
Timok Copper and Gold project consists of two mineralized zones:
| Timok Upper Zone, a high grade massive sulphide body and
| Timok Lower Zone, a lower grade porphyry style deposit.
The Upper Zone is currently in pre-feasibility stage, with ongoing exploration on the underlying Lower Zone porphyry.