Second phase of reconstruction of Terminal 1 at Nikola Tesla Airport to begin
Passengers will thereby be able to access registration counters at Terminal 1 and the border crossing on the floor of this terminal, the Nikola Tesla Airport reported.
The works in this phase of the reconstruction should take 20 days. In that period, passengers will be able to use all entrances to the terminal building except for the interior link between Terminals 1 and 2 through the connecting section.
Passenger and luggage check-in counters, as well as passport control in both terminals of the Nikola Tesla Airport will function as usual throughout this period.
During the works, passenger routes withing the airport will be marked by adequate temporary signposts.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
22.04.2024. | Industry, Transport
Serbia to develop project of “flying taxis” for EXPO with Airbus – Signing of memorandum announced
22.04.2024. | Industry, Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
22.04.2024. | Transport
City of Belgrade selling garages – Initial price EUR 7,000
22.04.2024. | Transport